Data of Business Structure

Our Power Plant

Anthracite , Bituminous mixed with Biomass 328 megawatts
Biomass 74.30 megawatts
Recovery Boiler 32.9 megawatts
Combined Generation Capacity 435.20 megawatts


Anthracite , Bituminous Mixed with Biomass Power Plant

Location : Prachinburi
Fuel : Anthracite, Bituminous mixed with Biomass
Generation capacity : 328 megawatts


Biomass Power Plant

Location : Prachinburi
Fuels : Bark, woodchip, black Liquor (waste from pulp production industry)
Generation capacity : 74.30 megawatts


Recovery Boiler

Location : PrachinBuri
Fuel : Black liquor (waste from pulp production industry)
Generation capacity : 32.9 megawatts



Supportive business
  • International marine transport business
  • Seaport business
  • Energy Tree business
Biomass Project 200 megawatts
Ethanol production business 155 million liters/ year
Independent Power Producer (IPP)
(Bituminous and Sub-bituminous) Project
600 megawatts